Wednesday, June 14, 2017

Very useful certification Questions -2



6. What will happen if a background job is running and the Operation Mode Switch is activated in between?

a. The job will be cancelled
b. The job will be put in Suspended state
c. The Job will continue to run and once it finishes then the Operation Mode Switch will occur
d. The Operation Mode will happen the next day

7.What is the order in which the Profile files are read during the system start? 

a. DEFAULT, INSTANCE & START
b. INSTANCE, DEFAULT & START
c. START, INSTANCE, DEFAULT
d. START, DEFAULT, INSTANCE

8.What is the Profile Parameter name used to set the Trace Level in SAP system? 

a. rdisp/trace_level
b. rdisp/tracelevel
c. rdisp/LEVEL
d. rdisp/TRACE

9.State whether the followings statements are True or False:

a. W Gate should always be on Web Server
b. A Gate should always be coupled with W Gate
c. SAP System should be installed on NT Operating System
d. Dual Host Installation in ITS means A Gate and W Gate are on the same host



10.‘Event-Based Job Scheduler’ runs on every instance (True / False)




No comments:

Post a Comment